TURNKEY PROJECT
Balance of Plant (BOP) of Steam Boilers and Thermic Fluid Heaters
- Boiler house layout planning and design
- Foundation layout design
- Preparation of complete BOP balance of plant, so that procurement can be done properly
- Installation of steam boiler / TF heater along with allied accessories of boiler house to its defined location
- Erection of FG ducting, air ducting, supporting structure of boiler house
- Refractory supply and laying works
- Electrical material supply and applying works
- Insulation works
- IBR Formalities of Boiler and Pipings
- Pre-commissioning and commissioning support during commissioning of boiler / TF heater
OUR PRODUTS AND SOLUTIONS
Balance of Plant
- Steam Boilers
- Thermic Fluid Heaters
- Hot Water Generators
- Hot Air Generators
- Thermosyphon
- Waste Heat Recovery Boilers
Pollution Control Systems
- Electrostatic Precipitator (ESP)
- Bag Filters
- Cyclone Seperators
- Wet Scrubbers
Conveying Systems
- Fuel Handling System
- Ash Handling System
Turnkey EPC Solutions
- Design, Procurement, Fabrication
- Site Mechanical & Electrical Installation
- Electrical, Automation & Instrumentation
- Commissioning & Testing
Services
- Engineering Services (CAD, 3D, Thermal design)
- Project Management
- Installation & Commissioning
- IS Chimney Design
- Mechanical Structure Design
- Energy Audit & Energy Savings
- Spare Parts Supply
Valves & Accessories
- Globe and Gate Valves
- Ball Valves
- Pressure Reducing Station
- Condensate Recovery System
- Y Strainers & NRV
BUSINESS OVERVIEW
STEP:1
Commercial Estimations
- Based on different requirements of end user, Making Commercial Estimations based on Technical Evolution and selecting correct product which is cost effecient and viable for Project Requirements
STEP:2
Design & Engineering
- Boiler house layout design
- Foundation layout design
- Designing of Process Utility Pipings
- Designing of Pollution Control Equipments
STEP:3
Planning
- Prepare the complete project timeline
- Manpower management
- Detailed BOQ as per scope for procurement
STEP:4
Procurement
- Technical Evolution and Comparision
- Purchase planning as per BOQ sheet
STEP:5
Erection and Installation
- Installation work as per boiler house layout by Experienced Team
- Quality Control by our Engneering Team
STEP:6
Complete commissioning assistance
- Complete commissioning assistance
- Free Lifetime Technical Support to our Customers